Constructions near TX Spur 347
See Also
Accidents near this location Accidents near me Constructions near meCurrent Constructions
- MAPRoadwork from Denton Hwy (US-377) exit [18] to NE Loop 820.
Roadwork from Denton Hwy (US-377) exit [18] to NE Loop 820.
Start Time: 2024-05-22T02:46:49.000-05:00
End Time: 2024-05-24T23:59:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-05-22T02:00:00.000-05:00
End Time: 2024-05-23T10:00:00.000-05:00
map local traffic - MAPMultiple lane closures. Night work only. IH 820 SB from Trinity Blvd to Randol Mill. Multiple lane closures to install OSS MICA.
Multiple lane closures. Night work only. IH 820 SB from Trinity Blvd to Randol Mill. Multiple lane closures to install OSS MICA.
Start Time: 2024-05-22T02:00:00.000-05:00
End Time: 2024-05-22T11:00:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-05-22T02:00:00.000-05:00
End Time: 2024-05-23T10:00:00.000-05:00
map local traffic - MAPRoadwork from NE Loop 820 / Denton Hwy to Interstate 820.
Roadwork from NE Loop 820 / Denton Hwy to Interstate 820.
Start Time: 2024-05-22T01:50:00.000-05:00
End Time: 2024-05-24T23:59:00.000-05:00
map local traffic - MAPHemphill St is closed from I-20/SW Loop 820 to John B Sias Memorial Pkwy/Tasman St.
Hemphill St is closed from I-20/SW Loop 820 to John B Sias Memorial Pkwy/Tasman St.
Start Time: 2024-05-21T08:18:22.000-05:00
End Time: 2024-05-23T23:59:00.000-05:00
map local traffic - MAPTX-183 / NE 28th St is closed from US-287 Bus/N Main St (28th St/TX-183) to Deen Rd (NE 28th St/TX-183).
TX-183 / NE 28th St is closed from US-287 Bus/N Main St (28th St/TX-183) to Deen Rd (NE 28th St/TX-183).
Start Time: 2024-05-21T04:29:19.000-05:00
End Time: 2024-05-23T23:59:00.000-05:00
map local traffic - MAPRoadworks scheduled 22/05/2024 - 23/05/2024
Roadworks scheduled 22/05/2024 - 23/05/2024
Start Time: 2024-05-21T02:00:00.000-05:00
End Time: 2024-05-23T10:30:00.000-05:00
map local traffic - MAPMultiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10 multiple alternating lanes for level up and surface paving.
Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10 multiple alternating lanes for level up and surface paving.
Start Time: 2024-05-21T02:00:00.000-05:00
End Time: 2024-05-31T11:00:00.000-05:00
map local traffic - MAPEntrance Ramp closed. Nighttime closure only. The on-ramp to the eastbound I-820 general purpose lanes at Iron Horse Blvd. will be closed. Traffic will be redirected to the next entrance at Rufe Snow Dr.
Entrance Ramp closed. Nighttime closure only. The on-ramp to the eastbound I-820 general purpose lanes at Iron Horse Blvd. will be closed. Traffic will be redirected to the next entrance at Rufe Snow Dr.
Start Time: 2024-05-21T00:30:00.000-05:00
End Time: 2024-05-23T10:30:00.000-05:00
map local traffic - MAPMultiple lane closures. Night work only. IH 820 NB from NWDC on ramp to Glenview/Pipeline milling and level up/surface asphalt operation.
Multiple lane closures. Night work only. IH 820 NB from NWDC on ramp to Glenview/Pipeline milling and level up/surface asphalt operation.
Start Time: 2024-05-18T02:00:00.000-05:00
End Time: 2024-05-24T20:00:00.000-05:00
map local traffic - MAPLane closure scheduled 17/05/2024 - 22/05/2024
Lane closure scheduled 17/05/2024 - 22/05/2024
Start Time: 2024-05-07T02:00:00.000-05:00
End Time: 2024-05-22T11:00:00.000-05:00
map local traffic - MAPRoadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
Roadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
Start Time: 2024-05-21T23:46:30.000-05:00
End Time: 2024-05-22T05:59:38.819-05:00
map local traffic - MAPOwens St is closed from Waldemar St to E Belknap St.
Owens St is closed from Waldemar St to E Belknap St.
Start Time: 2024-05-21T13:58:10.000-05:00
End Time: 2024-05-23T23:59:00.000-05:00
map local traffic - MAPMultiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10 multiple alternating lanes for level up and surface paving.
Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10 multiple alternating lanes for level up and surface paving.
Start Time: 2024-05-21T02:00:00.000-05:00
End Time: 2024-05-31T11:00:00.000-05:00
map local traffic - MAPHedgeway Dr is closed from W Green Oaks Blvd / Valley Meadow Dr to Ridge Dr.
Hedgeway Dr is closed from W Green Oaks Blvd / Valley Meadow Dr to Ridge Dr.
Start Time: 2024-05-20T13:55:16.000-05:00
End Time: 2024-05-22T23:59:00.000-05:00
map local traffic - MAPThrall St is closed from E Vickery Blvd to Avenue A.
Thrall St is closed from E Vickery Blvd to Avenue A.
Start Time: 2024-05-20T08:32:30.000-05:00
End Time: 2024-05-23T23:59:00.000-05:00
map local traffic - MAPThrall St is closed from Avenue A to E Vickery Blvd.
Thrall St is closed from Avenue A to E Vickery Blvd.
Start Time: 2024-05-19T01:55:30.000-05:00
End Time: 2024-05-23T23:59:00.000-05:00
map local traffic - MAPRiver Willow Way is closed from Academy Blvd to Penta Rd.
River Willow Way is closed from Academy Blvd to Penta Rd.
Start Time: 2024-05-15T10:40:52.000-05:00
End Time: 2024-05-22T23:59:00.000-05:00
map local traffic - MAPRoadwork on Village Creek Rd from US Highway 287 to Martin Luther King Fwy.
Roadwork on Village Creek Rd from US Highway 287 to Martin Luther King Fwy.
Start Time: 2024-05-21T14:43:30.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPRoadwork on Blue Mound Rd / FM-156 from E Bailey Boswell Rd (Blue Mound Rd/FM-156) to Western Center Blvd (Blue Mound Rd/FM-156).
Roadwork on Blue Mound Rd / FM-156 from E Bailey Boswell Rd (Blue Mound Rd/FM-156) to Western Center Blvd (Blue Mound Rd/FM-156).
Start Time: 2024-05-21T03:41:30.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic - MAPRoadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Start Time: 2024-05-20T06:52:30.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPRoadwork on Morrison Dr at John T White Rd.
Roadwork on Morrison Dr at John T White Rd.
Start Time: 2024-05-19T18:03:30.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPRoadwork on S Hills Ave from Trail Lake Dr / Alton Rd to Bellaire Cir / S Hills Cir.
Roadwork on S Hills Ave from Trail Lake Dr / Alton Rd to Bellaire Cir / S Hills Cir.
Start Time: 2024-05-18T17:00:31.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPRoadwork on W Arkansas Ln from W Green Oaks Blvd to Little Rd.
Roadwork on W Arkansas Ln from W Green Oaks Blvd to Little Rd.
Start Time: 2024-05-14T13:42:00.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPRoadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
Roadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
Start Time: 2024-05-14T03:40:20.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPRoadwork on US-287 N Bus / N Main St from Belknap St (US-287 Bus) to W Northside Dr (US-287 Bus).
Roadwork on US-287 N Bus / N Main St from Belknap St (US-287 Bus) to W Northside Dr (US-287 Bus).
Start Time: 2024-05-10T20:43:00.000-05:00
End Time: 2024-05-22T05:59:38.820-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Southbound I-820 reduced to one lane between Ramey Avenue and Wilbarger Street.
Nighttime closure only. Travel lanes reduced to one lane. Southbound I-820 reduced to one lane between Ramey Avenue and Wilbarger Street.
Start Time: 2024-05-22T04:00:00.000-05:00
End Time: 2024-05-22T11:00:00.000-05:00
map local traffic - MAPStationary traffic on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage) due to roadwork.
Stationary traffic on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage) due to roadwork.
Start Time: 2024-05-22T03:52:30.000-05:00
End Time: 2024-05-22T04:25:30.000-05:00
map local traffic - MAPRoadwork on Blue Mound Rd / FM-156 from E Bailey Boswell Rd (Blue Mound Rd/FM-156) to Western Center Blvd (Blue Mound Rd/FM-156).
Roadwork on Blue Mound Rd / FM-156 from E Bailey Boswell Rd (Blue Mound Rd/FM-156) to Western Center Blvd (Blue Mound Rd/FM-156).
Start Time: 2024-05-21T03:41:30.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic
TX Spur 347 constructions near Junctions/Exits
Junction @ US 287(I 35W);Airport Freeway(TX 121)
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ North Freeway(US 377)(US 287)(I 35W)
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ North Hampton Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ North Nichols Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ East Belknap Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ North Pecan Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ Grove Street North
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ Grove Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ East Weatherford Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ Nichols Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ Hampton Street
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ US 377
Nearby city: Fort Worth, Texas
Nearby Constructions
Junction @ Airport Freeway(TX 121);North South Freeway(US 377);US 377(US 287)(I 35W)
Nearby city: Fort Worth, Texas
Nearby Constructions